I have spent the last three days stripping out old wires and identifying cables in preparation for the rewire. There are still lots of unidentified cables but I have gone as far as I dare without removing something needed. The next step is starting to rebuild it all starting with the power in. I need to move the battery charger and install the inverter and solar system and start to build the nav station back panel. I want to convert the lift up map store to be a drawer and have to re-cover a headlining panel I have all the parts for those jobs but most of the 12v distribution will have to wait for more parts.
![](https://i0.wp.com/www.john-barrett.uk/wp-content/uploads/2020/10/wp-16037858060501294027769516469131.jpg?resize=1024%2C576&ssl=1)